Construction Sequence
Although the specific sequence of construction steps varies and overlaps, generally we build
your home in the following order:
- Foundation
- Excavation
- Footing installation
- Form and pour walls
- Perimeter drain if applicable
- Damp proof or Foundation wrap
- Inspection
- Framing
- First floor
- Second floor if applicable
- Roof trusses
- Roof sheathing
- Windows and exterior doors
- Roofing
- Felt or paper if applicable
- Flashing
- Shingles
Exterior
- Exterior cladding
- Trim Boards
- Siding
- Soffit and Fascia
- Deck if applicable
- Eaves trough and downspouts
- Exterior painting or staining
- Concrete
- Rough grading
Interior
- Rough-in of mechanical systems
- HVAC (heating, ventilating, and air conditioning)
- Plumbing
- Electrical
- Rough-in inspections
- Insulation
- Inspection
- Drywall
- Boarding
- Tape and texture
- Sand
- Interior trim
- Doors
- Baseboards, casings, other details
- Cabinets and countertops
- Paint and stain
- Finish work
- Tile
- Floor coverings
- Hardware
- Screens
- Light fixtures
- Plumbing fixtures
- Appliances
- Construction cleaning
- Homeowner orientation
- Certificate of Possession
- Closing
- Warranty service
|